Linz - Planning Measures in a Team |
Damages >> | ||||||||||||||||||||||||||
|
This was the first project in Austria using transparent thermal insulation. This is a special insulation system reducing the loss of energy through the walls and leading sun radiance through the walls into the room. Renovation was based on planning the measures in a team. Multi-family Home From the 60-ies Facade Plastering Damages Improving Thermal Insulation
50% Reduction of Thermal Energy Based on the building's orientation and given facade- and window-areas, a total of approx. 120 m2 of transparent thermal insulation system were mounted, approx. 40 m2 on the south-east facade, approx. 53 m2 on the south-west facade and approx. 27 m2 on the north-west facade. The energy key figure was 150 kWh/m2 before renovation and 50 kWh/m2 after renovation. The following pages portray the individual steps of renovation highlighting specific features of the project and pointing out ecological aspects and future perspectives of skilled trades. |
Before:![]() © O.Ö.Energiesparverband After: ![]() © O.Ö.Energiesparverband |
||||||||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||||||||